Ventilating Deep Pipe Jacking Operations

Civil Engineering
Project Overview

A major underground pipe jacking project, crews were working deep below ground with limited natural airflow.

Challenge

During a major underground pipe jacking project, crews were working deep below ground with limited natural airflow. The challenges were clear:

  • Supply fresh air through kilometres of ducting into confined spaces.
  • Protect workers from the build-up of harmful fumes.
  • Maintain compliance with WHS standards for underground ventilation.

The contractor required a powerful and reliable system that could deliver clean, breathable air consistently across long distances.

Solution

RVT Group’s Technical Consultants designed a tailored ventilation system built around our high-performance, industry-leading centrifugal fans. These units were capable of:

  • Generating the pressure required to push fresh air through extended ducting runs.
  • Ensuring constant airflow even under demanding site conditions.
  • Maintaining safe oxygen levels and diluting hazardous contaminants.

This engineered approach provided crews with a consistent supply of fresh air, creating a safer and more productive underground work environment.

The results

The outcome was a robust, compliant ventilation system that:

Demonstrated the reliability of RVT Group’s centrifugal fans — pumping air through kilometres of ducting without missing a beat.

Safeguarded workers’ health by maintaining clean, breathable air underground.

Ensured pipe jacking operations could proceed without delays caused by ventilation issues.

Products Used
Location

Australia

Written by
Kennedy Parker

Kennedy Parker

LinkedIn profile

Share case study

Share
Case Study

Related Resources

DSC07741
Contact us
Get in Touch